Result / Verification
Finished machined surfaces are protected with soft separation materials. Project release is governed by approved drawings, technical requirements, the agreed inspection plan and corresponding quality records.
Product technical recordParameters, inspection and delivery records
Component recordComplex housing and cavity component
Visible machining featuresCentral cavity, side interface, stepped connection faces and multiple hole locations
Finished-part handlingFinished surfaces separated by foam or other soft protective material
Technical basisMaterial, dimensions, tolerances and acceptance criteria are governed by the approved project technical documents
Inspection planMaterial identity and condition verified to the approved project specification
Critical diameters, steps, cavities, hole patterns and interfaces inspected to the approved drawing
Surface condition and any project-specific inspection items included in the agreed inspection plan
Delivery dossierApproved drawing and technical-requirement revision
Project-specific process and inspection records
Final dimensional and release documentation defined by the purchase specification